Sunday, March 1, 2020

Out to Whitiker Woods to connect with Soapstone Mountain with Wuzzam. 

There has been some extensive bridge work completed on the connector, and the single-track has been widened to make room for the equipment getting the wood in for the bridges.  A benefit of this is the briers which infringed on this route most of the year shouldn't be an issue any longer (hopefully).

8.3-miles, good work for us.

Stonewall at top of Whitiker - Soapstone Connector @ "Twin Black Oaks"

Wuzzam topping out at the Stonewall on the Connector

Frozen vernal pool on the Shenipsit Trail

Stonewall leading to Hill 621' in Whitiker Woods